Denver Gold Forum 2014: Sabina

This post provides primarily updates on Sabina (SBB). Please see archive for a more thorough report on fundamentals.

SBB has 194 million outstanding shares trading at 61 cents US, or $118 million market cap. Cash was projected year-end at $39 million, and year-end 2015 at $23 million. Year-end 2014 enterprise value would be $79 million. A complete feasibility study will be due early next year.

Part of the 2014 Denver Gold Forum presentation centered around improvement to the old pre-feasibility at Back River, which killed the stock. This came in at $685 cash cost and a disappointing $290 million NPV. The mine life was put at eight and half years with 300,000 ounces a year.

Since then, 1 million more measured and indicated has been added to extend the mine life. Now the open pit alone should last about eight years, with underground pretty open ended. There are plenty of nearby targets as well, but Sabina has shut down further exploration for now.

A new metallurgical study has boosted recoveries from 88% to 93.9%. Obviously NPV should get a nice boost, and operating costs will come down in the new feasibility. Mining construction costs in general have been reduced since Sabina’s dated PFS. Stock appears to be selling at about 15% of a new NPV number.

Sabina has about 5.3 million ounces of measured and indicated 5.81 gram ore, and 1,927,000 ounces of 7,33 grams of inferred.

Sabina has a substantial silver royalty on Glencore’s Hackett project, one of the largest undeveloped zinc deposits in the world. After spending $80 million there last year, Glencore has put that project on hold.

SBB anticipates permitting in the first half of 2016. There is no opposition, and the mining issues are equivalent to those seen in Nunavut in the past. The region has a number of mining operations, which is not a new feature for this part of Canada.

This entry was posted in Uncategorized . Bookmark the permalink .